Handling Towers – Contingency Plan

tour de manutention

Norda Stelo Construction delivered this project in an EPC mode. The contract included the design and construction of five alumina loading and processing stations and a petroleum coke loading system consisting of five 70 and 100 foot high handling towers covering a total area of 4,000 square feet. Bucket elevators, air casters, roll breaker, a screw conveyor and a dust collector were the main equipment installed.

  • Aluminerie Alouette
  • Quebec, Canada

Related projects